Projects

See examples of our modernisation and upgrade works.

  • Controller and Hydraulic Unit
    BEFORE
  • BEFORE
  • AFTER
  • AFTER

Modernisation of a Lift Controller and Hydraulic Motor and Power Unit in an Office Block in Wallington

The office has one Passenger lift serving all three floors of the office and relies daily on it.

TThe existing 50-year-old system came to the end of its lifespan when the Hydraulic Hose connecting the tank and shaft cylinder split, meaning an upgrade was necessary. Arrival quoted for both a new controller and hydraulic system, as well as upgrades to the car door motor system, shaft positioning equipment, and car and landing push stations that were necessary to communicate with the new controller.

The project was completed in 4 weeks for the lift to go back in service in the new year, and has been running smoothly since.

  • OLD
  • NEW

Modernisation of a Lift Controller in a Nursing Home in Thornton Heath

The home has 2x Lift serving different areas of the building. The front lift was having daily issues in which the lift was over-travelling the terminal floors leading to entrapments, and causing the residents distress.

The existing control board on the 20 year old panel was at fault, and Arrival Lifts, who had been maintaining the lift for a number of years, advised to replace the control panel with a modern, processor driven with fault diagnosis model, to extend the lifespan of the installation and improve the reliability of the lift.

The project was completed over a 2 week period, including testing procedures, in order to keep disruption to the nursing home at an absolute minimal.

Modernisation of a Lift Controller and Car Interior Refurbishment of a Residential Block in Leatherhead

An existing office block was being converted into flats serving 4 floors. The scope of these works included modernizing the existing Traction Passenger Lift and refurbishment of the car interior to a modern sleek look, as well as health and safety upgrades and improvement works.

The project was carried out and completed within 6 weeks, and appropriate testing and handover documents were completed.